Neckar Bridge Zwingenberg

The new construction of the Neckar Bridge is a major contribution to the improvement of the infrastructure within the municipal district, but the neighbouring districts and the entire administrative district also profit from the creation of a connection that can withstand any weather conditions as part of the Neckar network of cycling paths. The bridge replaces the previously used ferry and gives cyclists an easy connection to continue their journey on the southern Neckar Valley Cycle Path.
Steel cable construction for the bridge over the Neckar valley at Zwingenberg
Delivery scope: Planning, production and assembly of the steel construction incl. cables and corrosion protection
Weight: 500 t
Client: Municipality of Zwingenberg
Construction time: 2009–2011
Location: Zwingenberg, Germany