Viaduct M8 motor­way bridge

Viaduct M8 near Szentgotthárd represents an important connecting section for Hungarian-Austrian border traffic. As a new transit hub, it enables fast and undisrupted transit for travellers and the transport of goods between Graz and the south-west of Hungary. The structure, weighing in at 1,050 tonnes, was implemented by MCE from 2018 to 2020.
Supporting structure of the Szentgotthárd valley bridge
Delivery scope: Fabrication, corrosion protection and assembly of the steel constructions of the steel composite bridge
Weight: 1.050 t
Client: NIF Zrt
Construction time: 2018–2020
Location: M8 motorway near the Hungarian-Austrian border at Szentgotthárd/Heiligenkreuz